• Liverpool One Liverpool One
    Anodised aluminium interlocking soffit tray system and secret fix copings over canopied walkway at basement, ground and upper levels in main shopping complex.
  • Emirates Stadium Emirates Stadium, London
    Mill finish aluminium interlocking soffit tray and bullnose fascia system to pitch side and external elevations.
  • Queens Hospital Queens Hospital, Romford
    Polyester powder coated aluminium fascias, soffits, secret fix coping and louvres to external elevations.
  • Bury, The Rock Bury, The Rock
    Aluminium shingles, curved copings, ACM fascias and column casings
  • Victoria Gate Victoria Gate, Leeds
    Plasmet PR-600 tongue and groove aluminium rainscreen system with 20mm vertical and horizontal joints.
  • Albion Riverside Albion Riverside, London
    360 linear metres of facetted powder coated aluminium bullnose fascias with secret fix joint
Resources / Maintainance Datasheets

All materials will stain and discolour due to surface deposits, and cannot be considered completely maintenance-free. In order to retain maximum corrosion resistance and aesthetic appeal, the surface of materials must be kept clean. Provided the material correctly specificied for its intended purpose, and cleaning schedules carried out on a regular basis, then good performance and long service life are assured.

The following datasheets are the most commonly requested. Please contact our technical department for any unlisted safety and maintainance data sheets. In order to view these downloads you will need to have Adobe Acrobat Reader

Please click on a link below to download maintainance datasheet